How It Works
Your journey from backyard to rental income in 8 simple steps
The 8-Step Process
Step 1: Feasibility Check
Timeline: Day 1
We assess your property to determine if it can accommodate a garden suite. This includes checking lot size, access, setback requirements, and local zoning regulations.
- Free property assessment
- Zoning verification
- Preliminary layout options
- Budget consultation
Step 2: Site Survey
Timeline: Week 1
Professional surveyors measure your property and document existing conditions. This data is crucial for accurate design and permitting.
- Topographical survey
- Utility location mapping
- Access route planning
- Site photos and documentation
Step 3: Design & Permitting
Timeline: Weeks 2-4
We prepare all necessary drawings and documentation, then submit to your local municipality for approval. We handle all communication with building departments.
- Architectural drawings
- Engineering calculations
- Permit application submission
- Revision management
Step 4: Engineering
Timeline: Week 3
Licensed professional engineers review and stamp all structural, electrical, and mechanical plans to ensure code compliance and safety.
- Structural engineering review
- Professional engineer stamps
- Load calculations
- Building code compliance verification
Step 5: Foundation Preparation
Timeline: Week 5-6
Once permits are approved, we prepare the site and pour the foundation. This creates a level, stable platform for your garden suite.
- Site excavation
- Foundation forms
- Concrete pouring
- Utility stub-outs
Step 6: Module Delivery
Timeline: Week 7
Your pre-fabricated garden suite modules arrive on site via crane truck. Modules are precision-built in our controlled factory environment.
- Factory quality inspection
- Transportation coordination
- Crane placement
- Module positioning
Step 7: Assembly & Connections
Timeline: Week 7-8
Our expert team connects modules, completes utility hookups, and finishes all interior and exterior details.
- Module joining and sealing
- Electrical connections
- Plumbing connections
- HVAC installation
- Interior finishing
- Exterior siding completion
Step 8: Final Inspections & Handover
Timeline: Week 8
Building inspectors verify all work meets code requirements. Once approved, we hand over the keys to your new garden suite.
- Municipal building inspections
- Quality control walkthrough
- Occupancy permit issuance
- Owner orientation and handover
- Warranty documentation
Traditional vs. Axya Process
Traditional Construction
- Timeline: 6-12 months
- Weather delays: Frequent
- Cost certainty: Variable
- Quality control: On-site dependent
- Permitting: Owner manages
Axya Process
- Timeline: 6-8 weeks
- Weather delays: Minimal
- Cost certainty: Fixed price
- Quality control: Factory precision
- Permitting: Fully managed
Why Choose Pre-Engineered?
Faster Timeline
Factory construction happens simultaneously with site prep, cutting total time by 60-70% compared to traditional builds.
Precision Manufacturing
Controlled factory environment ensures consistent quality, perfect measurements, and superior materials protection.
Cost Predictability
One fixed price includes everything. No surprise costs, change orders, or budget overruns during construction.